Equipment Checklist for AASHTO T 146-88
Dry Preparation of Disturbed Soil
and Soil Aggregate for Test

 
All equipment shall be inspected for compliance with appropriate dimensions, as stated in each standard, as well as to determine if it is in satisfactory operation condition (i.e. clean, tight and serviceable). Inspection shall occur at least annually, or whenever there is reason to suspect nonconformance with the standard.

 

 

Item Sieves
Description Appropriate sizes which include at least the 50mm, 19mm, 4.75mm 2mm, and 0.425 mm.
     
Calibration Item Opening Size
Calibration Procedure AASHTO M 92
Calibration Interval Not stated
 

Item Pulverizing Apparatus
Description Mortar and rubber-tipped pestle, rubber covered power muller
     
Calibration Item See the general statement above
Calibration Procedure
Calibration Interval
 

Item Sample Splitter
Description Riffle splitter, meeting requirements of AASHTO T 87, Sec. 2.5
Proportional splitting, in accordance with
AASHTO T 248, (canvas cloth and shovel)
     
Calibration Item See general statement above.
Calibration Procedure
Calibration Interval
 

Item Drying Apparatus (Optional)
Description Any device capable of drying samples at temperatures below 60C.
     
Calibration Item See general statement above.
Calibration Procedure
Calibration Interval
 

Item Balance
Description Conforms to AASHTO M 231, Table 2
     
Calibration Item Accuracy and condition
Calibration Procedure AASHTO M 231, Sec. 4.2 and 4.3
Calibration Interval Not stated
 

Item Buchner Funnel (Optional)
Description Glass funnel and filter paper subject to vacuum for recovering solids
     
Calibration Item See general statement above
Calibration Procedure
Calibration Interval