|
|
| All equipment shall be inspected for compliance with appropriate dimensions, as stated in each standard, as well as to determine if it is in satisfactory operating condition (i.e.; adherence of mortar, deformed molds, etc.). Inspection shall occur at least annually, or whenever there is reason to suspect nonconformance with the standard. |
|
|
| |
| Item | Sieves | |
| Description | Wire cloth mounted in a frame | |
| Calibration Item | Check Openings | |
| Calibration Procedure | See Annex A1.2 | |
| Calibration Interval | ||
| Calibration Item | Check physical condition | |
| Calibration Procedure | See Section 5 | |
| Calibration Interval | 6 months | |
|
|
|